On-site boilers at a bio-digester plant had failed, resulting in an interruption of the fuel gas production process due to system cooling. The challenge was to quickly design and implement a temporary replacement system to restore operation, while a long-term solution was implemented.

What Did We Do?

Our expert attended site and carried out a survey to identify the nature and scale of the problem. A system design and project plan was produced to address the heating requirements.

How Did We Do It?

Once the approach was agreed with the customer, we employed a large HIAB plus trailer to deliver a 2MW boiler to site, supported by a 20,000 ltr fuel tank. This was connected by flexible pipework to the main flow and return heating coil using the customer’s flange connections.

Equipment – 1 x 1MW CR 2,000 Boiler

End User – A major water utility company

Application – Bio-digester plant producing fuel gas

Additional – 20,000 ltr fuel tank, flexible pipe work, cables

The Results

Once installed and commissioned, the hire boiler quickly generated sufficient hot water to restart the biological process within the bio-digester. Full production of fuel gas was rapidly re-established. The timely intervention eliminated the need to remove the inactive contents and restart the entire process, resulting in significant savings in time, cost, and productivity.

The Regional Sales Manager at Carrier Rental Systems said: “The project enabled continuity of operation at the plant, upon which more than 1 million customers depended. It highlights the importance of a rapid response and a tailored solution to ensure a successful outcome.”

Other References

Utilities & Energy
Boilers

Utilities - Water Boiler Hire - 250 kW Boiler Hire - Scotland

One of the largest water treatment works in Scotland, at Banchory near Aberdeen, recently underwent a major cleaning operation. However existing plant was unable to supply the large volume of hot water required.

Read more
Healthcare
Boilers

Healthcare Hospital Boiler Hire - 100 kW Boiler Hire - London

London’s Kings’ College Hospital required a temporary heating solution during planned maintenance work on its boiler, in a project lasting eight weeks.

Read more
Hotel & Leisure
Boilers

Hotel Heating Hire, Luton Hotel - Hot Water, 250kW Boiler Hire

A failure in the main boiler at this 200-bedroom prestigious hotel left guests without hot water. The challenge was to quickly assess the requirement and provide a rapid temporary solution to ensure service was restored as soon as possible while repairs were carried out on the existing boiler or a replacement installed.​

Read more
Utilities & Energy
Air-to-Water Chillers

Utilities - Water Bio-Digester Cooling Reading 100 kW Chiller Hire

The contents of a bio-digester plant needed to be cooled to arrest biological activity, prior to the system being emptied to enable maintenance work to be carried out.

Read more
Utilities & Energy
Air-to-Water Chillers

Utilities - Water Pump Cooling 300 kW Chiller Hire

Pump motors were found to be overheating during the installation phase of a major water utility pumping works, believed to be one of the largest in Europe. Time pressure to deliver the project and ensure continuity of service meant that a rapid and reliable solution was required.​

Read more
Facility Management
Boilers
Fuel Tanks

Facilities Management Boiler Hire - 500 kW Boiler Hire - London

Following the unexpected failure of the building’s heating and hot water boiler, Carrier Rental Systems provided a temporary 500 kW boiler hire solution in London. The installation enabled the site to continue operating without interruption.

Read more