Contact Us English | UK
  1. Rental
  2. Plastic and Paper

Temporary Cooling and Heating Hire for the Plastics & Paper Industry

Carrier Rental Systems provides flexible, cost-effective temperature control solutions for the plastics industry.

Bringing the benefits of additional production capacity to the plastics & paper sector​

HVAC systems are essential for maintaining optimal conditions in plastic manufacturing facilities, ensuring product quality, worker comfort, and compliance with industry regulations. ​

At Carrier, we understand the distinct challenges that businesses encounter in plastic moulding manufacturing, particularly concerning environmental control. Ensuring safe temperature regulation and ventilation throughout the year is crucial for both productivity and the well-being of employees. ​

We provide specialised temperature control systems tailored for the chemical industry, guaranteeing that your operations remain safe, efficient, and produce high-quality results.

By supplying stand-alone cooling and heating solutions, we can quickly attach equipment to your permanent systems. By supplying equipment to complement existing on-site capacity, we can increase your output without capital costs.​

We provide immediate 24-hour availability of chillers ranging from 8kW to 1202kW, air conditioning units from 2.6kW to 500kW, as well as portable spot cooling and space heating. Additionally, our services include low temperature hot water boilers and fully equipped temporary plant rooms from 50kW to 2000kW. ​

Explore our case studies to see how our HVAC solutions can benefit your project

Industry
Air-to-Water Chillers

Plastic Manufacturing, Injection Moulding - Cooling Hire - Midlands - 1,200kW Chiller Hire

A multiple chiller failure at this plastics injection moulding specialist left the company without vital process cooling for its manufacturing facility. It required a rapid response from CRS to evaluate the requirement, and supply and install a number of temporary water chillers to restore production while the breakdown of existing plant was fully assessed and a long-term remedial plan put in place.​

Read more