The installation was completed successfully within the access and space constraints of the Grade I Listed building through a combination of off-site preparation, verification of the chiller access opening and specialist lifting and logistics operations.
The Project
As part of the redevelopment of a Grade I Listed building in central London into a five-star luxury hotel, Carrier was selected to provide the cooling and air handling equipment.
The development includes 100 guest bedrooms, restaurants and bars, together with a ballroom, spa, swimming pool and guest areas.
Carrier supplied four 650kW water-cooled chillers, providing a combined cooling capacity of 2.6MW, together with approximately 15 air handling units (AHUs) serving areas across the development.
The Challenge
Installing the HVAC equipment within a Grade I Listed building presented a number of engineering and logistical challenges.
The chillers needed to be installed in the basement, while the AHUs were required in various locations across the lower levels of the building. The building’s listed status, restricted access and limited installation space required an installation strategy tailored to the existing structure.
The central London location created further logistical constraints. Deliveries had to be scheduled within specific time windows to minimise disruption, with restrictions on vehicle sizes and requirements for efficient offloading.
The project also required careful coordination around London’s underground transport infrastructure.
The Solution
Carrier worked with the wider project team to develop an installation strategy around the building’s access and space constraints.
To enable the AHUs to reach their final locations, the units were dismantled at Carrier’s facilities and transported to site in flat-pack form. Carrier engineers then reassembled them on site, allowing the equipment to be installed within ceiling voids and other restricted spaces across different levels of the building.
Installing the four water-cooled chillers required detailed logistical planning. A temporary access point was created in the road to enable the units to be lowered into the basement.
Before installation, a wooden model of a chiller was used to verify that the equipment could pass through the temporary access opening.
Specialist logistics and lifting teams then lowered, manoeuvred and positioned the chillers within the basement.
The Result
The HVAC equipment was delivered and installed on schedule.
The four 650kW water-cooled chillers provide a combined cooling capacity of 2.6MW, while the AHUs serve multiple areas of the hotel, including the ballroom, kitchen, spa, main lounge and guest lounge.
The Carrier chillers and AHUs form part of the hotel’s wider HVAC system, alongside fan coil units and dry air coolers, which together provide climate control throughout the building.
The installation was completed successfully within the access and space constraints of the Grade I Listed building through a combination of off-site preparation, verification of the chiller access opening and specialist lifting and logistics operations.
Carrier will provide ongoing service, support and maintenance for the chillers and AHUs, which include a five-year warranty.
To find out more about Carrier’s decarbonisation, products and solutions, please visit: HVAC Decarbonisation Solutions: Achieve Net Zero
You can also write to us at uk.info@carrier.com or contact one of our Experts